SoftPlan 2022 New Features: Beams Finish OptionFinish Option added. Allows a Beam to be painted in the model. ScheduleThe Drawing is Prefaced on the Beam ID in a Beam Schedule if a beam schedule is using the stack and Beam IDs are enabled. SectionBeam profile is extracted in section. PocketEdited Beam Projections are not affected by the cleanup command. Wall MaterialMaterial HSS, hollow steel section, added.